Aditya Solar Marketing

ROOFTOP SOLAR POWER PLANT

EPC for rooftop solar power plant

We do comprehensive end-to-end EPC (Engineering, Procurement, and Construction) services for rooftop solar power plants residential and industrial. We cater homes, schools, colleges, commercial buildings, government facilities and factories.

Our professional team of experts handle everything from consultation, design, procurement, installation and commissioning of solar rooftop systems. Additionally, we help you in getting net meter and subsidy on solar power plants in various government schemes. We provide one year hand holding support and ensures regular monitoring of solar power plant performance that you see an immediate savings on your power bills.

We facilitate hassle-free documentation and approvals for net-metering on your behalf.

Get Free Consultation

Just call on +91-7060152063 to get free consultation to know more about solar power plant, energy generation, installation of solar power, installation capacity, costs and ROI.

How Much Rooftop Solar Power Plant Costs!

Just get an idea how much you will save on solar rooftop power plant.

Rooftop Solar Power Plant - Residential

rooftop solar power plant

Is solar rooftop power plant worth investment

Yes, with the changes in solar policy by the central government and also by state governments installation of solar power plant got popularity with time.

With the launch of PM-Surya Ghar: Muft Bijli Yojna on 15th February 2024. Aimed at installing rooftop solar power plants in one crore household.  Installation of solar power plant for residential consumers become more profitable.

This government scheme aims to provide free electricity to one crore households in country. The scheme provides a subsidy on installation of solar power plant on rooftop covering up to 40% of the cost of the solar panels.

How to calculate ROI on Solar Rooftop Power Plant

ROI = (Total Investment – Subsidy)/Annual Savings in Electricity Bill

Annual Saving = Number of Electrical Units generated per year X Rate of Unit

Capacity (KW) Subsidy Central Subsidy State (UP) Total Subsidy
1KW
30,000
15,000
45,000
2KW
60,000
30,000
90,000
3KW
78,000
30,000
1,08,000
5KW
78,000
30,000
1,08,000

Process - Subsidy on rooftop solar power plant

PM Surya Ghar Muft Bijli Yojana Subsidy Flowchart

Rooftop Solar Power Plant - Industrial

Process - How solar power plant is installed

Project Feasibility and Assessment

We conduct a preliminary feasibility study and valuate the potential at the site in frame of environmental, geographical and regulatory factors and applicable law.

Project Design and Engineering

Developing detailed designs based on collected data & information from the customer and site. Creation of layouts, SLD, finalization of specifications, energy yield calculations& financial modeling.

Permitting and Approvals

Securing work, land & site access permissions. Initiating & obtaining clearance from local authorities as per the scheduled timeline. Ensuring compliance with environmental & regulatoy laws.

Procurement of Equipment and Materials

Identifying, sampling, sourcing & procuring project compnents like solar panel, solar invertor, mounting arrangement, earthing, etc from identified suppliers after negotations & factory visits if required in scheduled timeline. Managing logistics & deliveries of material. Ensuring quality of procured material.

Construction and Installation

Preparation of site including various steps & process involved. Installation of material is done after conducting required sample testings.

Commissioning and Testing

After conducting electrical testing & safety inspections ensuring satisfactory working of solar panels, inverter, ACDB, DCDB, etc. The final integration of solar power plant is done with grid supply. Commissioning is done after obtaining necessary certifications & approvals.

Operations and Maintenance (O&M) Handover

Develop a plan for operations & maintenance of the project. Conducting training secessions, assigning responsibilitis for maintenance, monitoring power generation.

Project Handover

Handover of Project after ensuring project maintenance documents, warranties & service agreements are in place. We also do hand holding for one year & conducts post-completion performance review in scheduled intervals.

Scroll to Top